Building Pad Services

Grading & Site Prep for New Home Construction in Santa Cruz, Monterey & Santa Clara Counties

Getting ready to build a new home?

It all starts with a solid foundation—and that begins with a properly prepared building pad.

At Betz Works, we provide expert building pad services for residential construction projects across California’s Central Coast and the Bay Area.

From land clearing and grading to pad construction and compaction, we handle every step to make sure your home build starts on level ground—literally.

Call 831-400-8466 or fill out our online form for a free estimate today.

 

Our Professional Services

grading and site prep services betz works

Site Clearing & Debris Removal

We clear the area of brush, trees, rocks, and any existing structures to prepare your site for grading.

Rough Grading

We move and shape soil to meet elevation plans and create a buildable surface.

Pad Construction

Using your site plans, we build a flat, compacted pad with precise elevation and slope for your home’s foundation.

Soil Compaction & Testing

We compact the soil to meet structural requirements and prevent future settling. If needed, we coordinate with testing services to confirm compaction levels.

Drainage & Slope Adjustment

We shape the surrounding area to ensure proper drainage away from the structure—protecting your foundation from water damage.

Coordination with Builders & Surveyors

We work directly from your plans or surveyor’s stakes to make sure your pad is in the right place, at the right height, and built to spec.

How It Works

1. Site Evaluation & Estimate

We visit the property, review your building plans, and assess access, terrain, and grading needs. You’ll receive a clear estimate and timeline.

2. Clearing & Prep

We remove obstacles, mark out pad boundaries, and prep the area for earthwork.

3. Rough Grading

We reshape the land, bring in or remove soil as needed, and get the pad area close to final grade.

4. Pad Construction & Compaction

We construct the pad, compact the soil layer by layer, and meet the required compaction levels for structural support.

5. Final Grading & Clean-Up

We finish off the site with final grading for drainage and smooth transitions around the pad—leaving the site clean and ready for the next phase of construction.

Why Choose Betz Works?

why choose betz works for building pad services

Decades of Experience

With over 50 years of combined experience in earthwork, we know how to build pads that meet structural, drainage, and permitting requirements.

Licensed, Bonded & Insured

We’re fully covered and qualified to handle residential grading and pad construction projects of all sizes.

State-of-the-Art Equipment

From tight hillside lots to wide open rural builds, we have the right machines and operators to get the job done right.

Owner On-Site

Every job is personally overseen by our owner, so you know the work is done to spec—with clear communication from start to finish.

Trusted by Local Builders

We’re proud to be the go-to grading partner for custom home builders, contractors, and homeowners across Santa Cruz, Monterey, and Santa Clara counties.

Ready to Build? Start with a Proper Pad

A stable, level, well-compacted building pad is the key to avoiding future headaches with your foundation, drainage, or permits.

Whether you’re building your dream home or prepping land for a client, Betz Works is here to get the site ready—safely, efficiently, and exactly to plan.

Call 831-400-8466 or fill out our online form to request your free estimate today.

 

FAQs

What is a building pad?

A building pad is the flat, compacted area where your home’s foundation will be built. It must meet specific height, slope, and compaction requirements.

Do I need a building pad for new home construction?

Yes—it’s one of the first essential steps before laying a foundation. A proper pad ensures long-term structural stability and drainage.

What’s the difference between rough grading and pad grading?

Rough grading shapes the general area to match site plans. Pad grading is more precise, creating the exact buildable surface where your foundation will go.

How long does it take to prepare a building pad?

Most pads take 2–5 days, depending on the size, terrain, and site conditions.

Do I need permits?

In many cases, yes—especially if significant grading is involved. We can advise you and coordinate with your contractor as needed.

Which areas do you serve?

We work throughout Santa Cruz, Monterey, and Santa Clara Counties. See our full list of service areas.